Financing Available! Click Here!
On-site installation is as simple as connecting sections of track, securing the drive cable to the header, and wiring the controls and interlocks. That can cut up to a full day of installation time compared to other dumbwaiters.
The proven Ascent drive train system rides on a single extruded-aluminum track to eliminate the time and cost of assembling complex multi-channel rail systems. Plus, the simplified wiring of the cable-drum drive system is an integral part of the car.
The Ascent offers superb performance for years to come. No wonder we can guarantee it with the best warranty in the business.
For Pricing Please Call 1-888-473-7029